Technical Inquiry
Request a Slope Drill or Mining Scaler Quote
A dimensioned slope or roadway sketch, hole plan, and ground description make the first technical response much more useful.
Accurate Quotation
Information That Saves a Quote Cycle
| Field | What to send |
|---|---|
| Work geometry | Lifting or work height, hole position and angle, slope or roadway dimensions, clearance |
| Ground and task | Geology, hole diameter and depth, drilling method, scaling rock condition, production |
| Site and carrier | Bench or floor, grade, setup area, access, transport limits, wind, water, dust |
| Systems | Diesel or electric, voltage, compressor, flushing, tools, controls, cab or platform |
| Commercial and documents | Quantity, destination, trade term, timing, drawings, compliance, inspection, spares |
Frequently Asked Questions
How fast will Zhongmei respond?
The target is within 24 hours during the published business schedule. A complete inquiry usually receives more specific technical questions in the first reply.
Can I attach drawings or specifications?
Yes. Submit the form, then reply to the confirmation or email intl@chinacoalintl.com with drawings, data sheets, photos, packing lists, or destination requirements.
Will my inquiry appear in the existing Zhongmei admin system?
Yes. The form uses the existing inquiry field contract and adds a site-specific source_site value so the shared admin can filter, update, annotate, and export the record.