Practical guides for turning slope or roadway geometry into a comparable equipment quotation and checkable pre-shipment handover.

Crawler slope drill used to plan work geometry and hole location
/images/slope-drill-rig-field.jpg
August 19, 2026
Slope and Anchor Drill RFQ Checklist
Reach, hole, and carrier are separate decisions. A dimensioned work drawing connects them and exposes the real setup and transport constraints.
Read the guide
High-reach crawler slope drill used for lifting-height selection
/images/25-35m-lifting-drill-rig.jpg
August 19, 2026
How to Choose 15-35 m Lifting Height for a Slope Drill
The correct height comes from the real hole coordinates and setup point, with clearance, stability, access, and transport added to the reach diagram.
Read the guide
Crawler scaling machine used to review boom and roadway envelope
/images/scaling-machine-boom.jpg
August 19, 2026
Mining Scaler Roadway and Work-Envelope Checklist
Travel clearance and work clearance are different. The scaler must move through the roadway, deploy the boom, reach the loose rock, and preserve a safe operating zone.
Read the guide
Crawler drilling rig photographed for configuration and inspection review
/images/qcmg-slope-drill-rig.jpg
August 19, 2026
Pre-Shipment Inspection for Drill Rigs and Mining Scalers
The inspection should prove the exact configuration, move the agreed systems safely, reconcile tooling and documents, and record transport preparation.
Read the guideHave a Model List or Technical Specification?
Tell us the lifting height or work reach, hole diameter and depth, geology, slope or roadway dimensions, power, quantity, destination, and document requirements. We will return the open selection questions.