Shandong Zhongmei GroupDrilling & ScalingSlope Rigs & Mining Scalers

Frequently Asked Questions

Drilling and Scaling Questions

Frequently Asked Questions

Technical, commercial, documentation, inspection, and export answers for early supplier comparison.

What is the first input for a slope drilling rig?

Start with the required lifting or working height, hole angle and position, diameter and depth, geology, drilling method, slope and bench geometry, setup area, access, transport limits, power, production target, and destination.

Does every QCMG model drill 300 mm diameter and 50 m deep?

The supplied table repeats those references across the listed rows. Treat them as source-table values and confirm the released exact-model operating range, geology, tooling, and method before contracting.

What roadway section is required for the scaling machine?

The source files contain two section references, including a 2.0 × 2.0 m table value and a different minimum description. Send the real roadway profile and request the released model drawing before relying on either.

Will inquiries remain compatible with the existing Zhongmei backend?

Yes. The form uses the current shared fields and source_site=zhongmei-drilling-scaling, so the existing admin workflow can filter, annotate, update, and export records.

Is lifting height the same as drilling depth?

No. Lifting or working height describes where the drilling system reaches. Hole depth describes penetration into the ground. Both values, plus angle and geology, must be specified.

Can drill tools and auxiliary systems be included?

Yes. Send drilling method, hole range, geology, rod and bit preference, air or flushing requirements, compressor or pump scope, dust or water handling, and spare-parts needs.

Can a pre-shipment test prove field productivity?

A workshop test can confirm identity, configuration, movements, controls, and agreed functions. Field productivity depends on geology, setup, tooling, operator, and site conditions and needs a separately defined acceptance basis.

Send the Reach, Hole, Ground, and Site Envelope

Tell us the lifting height or work reach, hole diameter and depth, geology, slope or roadway dimensions, power, quantity, destination, and document requirements. We will return the open selection questions.